| Inland Fish Channel Stabilization construction |
| Inland Fish Fishway construction |
| Inland Fish Reshaping of channel bank |
| Inland Fish Structural Improvements |
| Inland Fish habitat structural maintenance |
| Range Grazing Structural Improvements - Structure |
| Recreation (General) - Each |
| Seed Collection from Superior Trees |
| Selection and Care of Superior Trees |
| T&ES structural habitat improvement |
| Treatment Monitoring Plot |
| Two-aged Shelterwood Establishment and Removal Cut (w/ res) (2A/RH/FH) |
| Watershed Resources Structrural Improvement |
| Wildlife Habitat Improvement |
| Wildlife Habitat Mechanical treatment |
| Wildlife Habitat Nest structures, dens development |
| Wildlife Habitat Rehabilitate openings |
| Wildlife Habitat Structural Improvement |
| Wildlife Habitat Water development |
| Wildlife habitat monitoring - each |
| Wildlife inventory - plots |
| Animal Damage Control for Reforestation |
| Broadcast Burning - Covers a majority of the unit |
| Burning of Piled Material |
| Certification of Natural Regeneration with Site Prep |
| Certification of Natural Regeneration without Site Prep |
| Certification-Planted |
| Chipping of Fuels |
| Commercial Thin |
| Compacting/Crushing of Fuels |
| Control of Understory Vegetation |
| Control of Understory Vegetation- Burning |
| Coppice Cut (EA/RH/FH) |
| Cruising |
| Cultural Resource Monitoring |
| Disease Prevention |
| Fill-in or Replant Trees |
| Fireline Construction |
| Fuel Break |
| Group Selection Cut (UA/RH/FH) |
| Harvest Without Restocking |
| Improvement Cut |
| Initiate Natural Regeneration |
| Inland Fish Structural Improvements |
| Inland Fish Thinning for Fish Habitat Improvement |
| Inland Fish habitat inventory |
| Inland Fisheries Habitat Improvement Activities |
| Inland fish habitat monitoring |
| Insect Control |
| Insect Prevention |
| Invasives - Biocontrol, Classic |
| Invasives - Biocontrol, Livestock |
| Invasives - Mechanical /Physical |
| Invasives - Pesticide Application |
| Invasives - Treatment Activity Monitoring |
| Jackpot Burning - Scattered concentrations |
| Layout and Design |
| Leave Tree Protection |
| Maintenance of Animal Damage Control for Reforestation |
| Management & Control of Recreation to Protect Resources |
| Marking/Designation |
| Native Species Established |
| Nonrange Fences - Area |
| Overstory Removal Cut (from advanced regeneration) (EA/RH/FH) |
| Patch Clearcut (EA/RH/FH) |
| Patch Clearcut (w/ leave trees) (EA/RH/FH) |
| Permanent Land Clearing |
| Piling of Fuels, Hand or Machine |
| Plant Trees |
| Plantation Survival Survey |
| Planting propagules and cuttings |
| Post Treatment Exam Fuels Mgt |
| Post Treatment Vegetation Monitoring |
| Precommercial Thin |
| Pretreatment Exam for Release or Precommercial Thinning |
| Prune |
| Pruning to Raise Canopy Height and Discourage Crown Fire |
| Public Information on Resource Management |
| Range Control Vegetation |
| Range Cover Manipulation |
| Range Fence Obliteration - Area |
| Range Fences - Area |
| Range Fertilization |
| Range Forage Improvement |
| Range Piling Slash |
| Re-vegetation treatments - herbicides |
| Re-vegetation treatments - vegetation removal |
| Rearrangement of Fuels |
| Reforestation Enhancement |
| Reforestation Need Created by Fire |
| Removal of Range Non-Structural Improvements |
| Road Maintenance - Vegetation Reduction |
| Salvage Cut (intermediate treatment, not regeneration) |
| Sanitation Cut |
| Seed Orchard Operations |
| Seed-tree Seed Cut (with and without leave trees) (EA/RH/NFH) |
| Seeding grasses, forbs and/or shrubs |
| Sensitive Species Species survey |
| Shelterwood Establishment Cut (with or without leave trees) (EA/RH/NFH) |
| Shelterwood Preparatory Cut (EA/NRH/NFH) |
| Shelterwood Removal Cut (w/ leave trees) (EA/NRH/FH) |
| Silvicultural Stand Examination |
| Single-tree Selection Cut (UA/RH/FH) |
| Site Preparation for Natural Regeneration - Burning |
| Site Preparation for Natural Regeneration - Chemical |
| Site Preparation for Natural Regeneration - Manual |
| Site Preparation for Natural Regeneration - Mechanical |
| Site Preparation for Natural Regeneration - Other |
| Site Preparation for Planting - Burning |
| Site Preparation for Planting - Chemical |
| Site Preparation for Planting - Manual |
| Site Preparation for Planting - Mechanical |
| Slashing - Pre-Site Preparation |
| Stand Clearcut (EA/RH/FH) |
| Stand Clearcut (w/ leave trees) (EA/RH/FH) |
| Stand Diagnosis Prepared |
| Stand Silviculture Prescription |
| Stocking Survey |
| TSI Certification - Release/weeding |
| TSI Certification - Thinning |
| TSI Need Created- Precommercial Thin |
| TSI Need Created- Release or Weeding |
| Thinning for Hazardous Fuels Reduction |
| Tree Encroachment Control |
| Tree Release and Weed |
| Two-aged Coppice Cut (w/res) (2A/RH/FH) |
| Two-aged Seed-tree Seed and Removal Cut (w/res) (2A/RH/FH) |
| Two-aged Shelterwood Establishment Cut (w/res) (2A/RH/NFH) |
| Two-aged Shelterwood Establishment and Removal Cut (w/ res) (2A/RH/FH) |
| Underburn - Low Intensity (Majority of Unit) |
| Vegetative Competition Survey |
| Watershed Analysis |
| Watershed Resource Non-Structural Improvements Erosion Cont |
| Watershed Resource Non-Structural Improvements Maintanence |
| Watershed Resource Non-Structural Improvements Riparian |
| Watershed Resource Non-Structural Improvements Stream Chann |
| Wildfire - Natural Ignition |
| Wildlife Habitat Activities |
| Wildlife Habitat Chemical treatment |
| Wildlife Habitat Create openings |
| Wildlife Habitat Improvement |
| Wildlife Habitat Intermediate cut |
| Wildlife Habitat Mechanical treatment |
| Wildlife Habitat Non-Structural Improvement |
| Wildlife Habitat Precommercial thinning |
| Wildlife Habitat Prescribed fire |
| Wildlife Habitat Release and weeding |
| Wildlife Habitat Seeding and planting |
| Wildlife Habitat Slash treatment |
| Wildlife habitat inventory |
| Yarding - Removal of Fuels by Carrying or Dragging |